English
  • English
  • Русский язык
  • Português
  • Tiếng Việt
  • IndonesiaName
  • 繁體中文
  • عربي
  • Français
  • ภาษาไทย
  • Español

河南升仕新材料有限公司

0
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

DN200 Force Transfer Joint

The correct installation of DN200 force transfer joints requires balancing mechanical stress and sealing reliability, with special attention to bolt tightening sequence, limit clearance adjustment and medium compatibility. For complex working conditions (such as high pressure and high temperature), it is recommended to form a complete solution by combining with compensators, supports and other accessories to extend service life and avoid system failures.

Interview share

I. Basic Parameters of DN200 Force Transfer Joint

ItemTypical Parameters
Nominal Diameter (DN)200mm (corresponding to 8-inch imperial)
Applicable Pipe OD219mm (carbon steel seamless pipe)
Working Pressure1.0MPa / 1.6MPa (common specifications)
MaterialBody: Q235 carbon steel; Sealing ring: EPDM rubber
Compensation CapacityAxial displacement ±10mm; Angular displacement ≤1.5°
Connection ModeFlange connection (compliant with GB/T 9115 standard)

II. Core Functions and Application Scenarios

  • Functional Principle:
    Fix flanges to pipes via bolts, and use force transfer screws to transmit pipeline thrust to the entire system, preventing displacement, leakage or damage to the joint caused by medium pressure or thermal expansion/contraction.
  • Typical Scenarios:
    • Inlet/outlet of water pumps, valve connections (to eliminate vibration stress);
    • Long-distance water/gas transmission pipelines (to balance axial thrust);
    • Water supply and drainage systems in high-rise buildings (to resist water pressure impact).

III. Correct Installation Steps (Preventing Leakage and Stress Damage)

Pre-installation Preparation
  • Check integrity of components: flanges, sealing rings, force transfer screws, nuts, limit bolts, etc.;
  • Grind pipe end faces: remove burrs and welding slag to ensure flat flange sealing surfaces (roughness ≤12.5μm).
Positioning and Alignment
  • Axial position: The natural length of the joint should be consistent with the pipeline spacing, and forced stretching or compression is prohibited (allowable deviation ±3mm);
  • Flange parallelism: Use a feeler gauge to detect the spacing between two flanges, with a maximum deviation ≤1mm (DN200 standard).
Key Points for Bolt Installation
  • Bolt material: 8.8-grade galvanized bolts (corrosion-resistant), with length ensuring 2-3 threads exposed after nut tightening;
  • Tightening sequence: Tighten diagonally and crosswise (as shown), gradually reaching the rated torque in 3 steps (reference value: M20 bolt torque 180-220N·m).
  1. Adjustment of Limit Devices
    • After installation, loosen the limit bolt nuts, reserve a 10mm axial clearance, then lock the lock nuts;
    • If system pressure >1.6MPa, install additional limit supports (spacing ≤3 times pipe diameter).

IV. Key Selection Parameters and Precautions

  • Medium Compatibility:
    • Water system: Select EPDM rubber sealing ring (temperature resistance -20℃~120℃);
    • Oil/acid-base media: Switch to NBR or fluororubber sealing rings (medium composition needs to be specified).
  • Temperature Difference Compensation Calculation:
    Example: For a DN200 carbon steel pipeline with a temperature difference of 50℃, the thermal expansion amount ΔL=12×10⁻⁶×L×50 (L is pipeline length). If L=50m, ΔL=30mm, ensuring the force transfer joint is used in conjunction with a compensator.
  • Adaptation to Special Working Conditions:
    • Buried installation: Flanges need anti-corrosion treatment (such as epoxy resin coating) with additional protective casings;
    • Vibrating environment: Install spring washers at screw connections and check bolt tightness quarterly.

V. Common Failures and Solutions

Failure PhenomenonPossible CausesSolutions
Leakage at flange jointAging sealing ring/loose boltsReplace sealing ring and retighten bolts according to torque standard
Abnormal pipeline vibrationForce transfer screws not loosened/limit too tightReadjust limit clearance to 5-10mm
Joint deformationOverpressure operation/untreated temperature differenceInstall pressure safety valve and add bellows compensator

VI. Maintenance Specifications

  1. Regular Inspection Cycles:
    • Within the first 3 months of operation: Check bolt torque monthly;
    • After normal operation: Inspect sealing ring aging condition semi-annually (replace if cracks >2mm).
  2. Anti-corrosion Treatment:
    • For outdoor installation, paint flange surfaces with anti-rust paint every 1-2 years (iron red primer + aluminum powder topcoat);
    • For seawater environments: Switch to 316L stainless steel flanges and screws.

VII. Industry Standards and Selection References

  • Execution standard: GB/T 12465-2017 Loose Sleeve Expansion Joints for Pipeline;
  • Selection tool: Refer to the following table based on system pressure, medium temperature and installation method (overhead/buried):
    Working Condition TypeRecommended ModelAdditional Configurations
    Municipal water supply/drainageVSSJAF(C2F) force transfer jointAnti-pull-off limit device
    Thermal pipeline networkVSSJA-2(B2F) double-flange force transfer jointHigh-temperature silicone sealing ring (temperature resistance 180℃)

Summary: The correct installation of DN200 force transfer joints requires balancing mechanical stress and sealing reliability, with special attention to bolt tightening sequence, limit clearance adjustment and medium compatibility. For complex working conditions (such as high pressure and high temperature), it is recommended to form a complete solution by combining with compensators, supports and other accessories to extend service life and avoid system failures.
DN200 Force Transfer Joint
The correct installation of DN200 force transfer joints requires balancing mechanical stress and sealing reliability, with special attention to bolt tightening sequence, limit clearance adjustment and medium compatibility. For complex working conditions (such as high pressure and high temperature), it is recommended to form a complete solution by combining with compensators, supports and other accessories to extend service life and avoid system failures.
Long press to look detail
Long by picture save/share
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully

DN200 Force Transfer Joint

enquiry
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully

Copyright © 2005-2015 Shengshi New Material Technology Co., Ltd.

Service Center
Contacts
Top
Service Center
Contacts
Tel
+86 13526660156
E-mail
wei25836999@gmail.com
Qrcode
添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了